Preparing a Scissor Lift for Transport
Five minutes of prep prevents most transport problems. Lower the platform completely, close and latch the extension deck, switch the batteries off or valve off the propane on dual fuel units, remove loose tools and the charger cord from the platform, and photograph the machine from all four sides and the hour meter before the carrier arrives. If the lift is at a jobsite, confirm gate access, a contact who will be there, and a hard surface for loading; soft ground is the most common pickup day surprise, because a 7,000 pound machine sinks where a pickup truck does not. Your coordinator sends this checklist at booking.
